Jeremy Rifkin, one of the World’s Leading Public Intellectuals, Argues in his New Book ‘Rescuing the Future’ that the People’s AI is on a Deep Existential Curve and Likely to Surpass the Corporate AI Giants Well Before Mid-Century in Bioregions Around the World

The great artificial-intelligence buildout has reached a scale at which it can no longer be regarded merely as another technology investment cycle. It is becoming a macroeconomic event.

UBS estimates reported in 2026 put prospective capital expenditures by the expanding universe of hyperscale AI infrastructure companies at roughly $4.1 trillion between 2026 and 2028—more than three times the approximately $1.29 trillion attributed to the preceding six years. One account of the UBS estimates puts the trajectory at roughly $1.0 trillion in 2026, $1.45 trillion in 2027 and $1.62 trillion in 2028. UBS itself has meanwhile estimated overall AI spending at about $900 billion in 2026 and $1.2 trillion in 2027, while warning that the higher near-term investment raises the hurdle for maintaining the spending trajectory thereafter.
These numbers are sufficiently large to pose an extraordinary economic question. What happens if the centralized hyperscale architecture being constructed today cannot earn returns commensurate with the enormous quantity of capital committed to it?

And an equally important question follows. What if this potential reckoning arrives precisely when a different architecture of artificial intelligence—distributed computing conducted progressively nearer the edge, embedded in factories, transportation systems, energy networks, farms, hospitals, municipalities and bioregions—is becoming technologically viable?

That possibility deserves serious consideration. But it requires separating three propositions that are too easily conflated.

The first—that hyperscale AI investment has created potentially dangerous financial vulnerabilities—is increasingly well supported.

The second—that a hyperscale correction could amplify a recession through banks, private credit, insurers, utilities and regional economies—is plausible, although by no means inevitable.

The third—that such a crisis would automatically replace centralized cloud computing with distributed fog and edge computing—is much more speculative. The emerging technological landscape is more likely to be a cloud-edge continuum in which centralized and distributed computation coexist, while the balance of economic power between them becomes one of the defining struggles of the coming decade.

The great $4.1 trillion wager

The sheer velocity of investment is remarkable. UBS reported in July 2026 that the AI investment cycle remained strong and expected overall AI spending to reach approximately $900 billion during the year and $1.2 trillion in 2027. Yet UBS was already cautioning that the growing capital requirements were raising the hurdle for maintaining expenditures into 2028. In another assessment, UBS noted that heavy capital spending was increasingly depressing hyperscalers’ free cash flow and warned that 2028 expenditures could ultimately fall below 2027 levels.

That is important because the economics of the boom differ profoundly from those of the software revolution that preceded it.

For several decades Silicon Valley celebrated the “asset-light” corporation. Software could be reproduced at negligible marginal cost. AI has reversed part of that logic. UBS Asset Management describes the transformation explicitly as a movement “from asset-light to AI-heavy.” Artificial intelligence requires semiconductor fabrication, GPUs, servers, cooling systems, fiber networks, substations, transmission capacity, enormous buildings and increasingly dedicated sources of electricity.

The International Energy Agency projects global data-center electricity consumption at roughly 945 terawatt-hours by 2030 in its base case—more than twice today’s level—with AI the most important driver of the increase. Data centers are especially problematic for grids because their loads are geographically concentrated.

The physical scale is therefore real.

But so is the central economic uncertainty: monetization.

UBS acknowledged this problem even before the latest upward revisions to investment. Its 2026 outlook observed that monetization was lagging capital expenditure and that hyperscaler capex had risen from approximately 40 percent of operating cash flows in 2023 to nearly 70 percent in 2025. UBS nevertheless saw enormous potential AI revenues if AI captured meaningful portions of global labor productivity.

The entire wager consequently depends upon the denominator catching up with the numerator: trillions invested today must eventually generate trillions in economically valuable services.

That is possible.

It is not guaranteed.

The thirty-year problem is really an asset-duration problem

Here an important correction to the premise is necessary. There is no single “normal thirty-year levelized return” governing an AI data center.

A data center is actually a bundle of assets with radically different economic lives.
A building may last thirty years. Transmission infrastructure can last longer. Financing for data-center real estate can commonly extend 15 to 30 years. Yet equipment financing may instead run three to five years.

The computational machinery ages faster still.

Meta, for example, has disclosed useful accounting lives of roughly four to five years for servers and network assets while assigning buildings lives of 25 to 30 years.

And financial markets can be even more skeptical about GPUs. Reuters reported in October 2026 that although Nvidia has argued that advanced GPUs can remain productive for considerably longer, lenders commonly evaluate them on roughly three-to-four-year depreciation schedules because technological change can rapidly erode their residual value.
This creates the great temporal contradiction at the heart of hyperscale AI.

A utility may construct electrical infrastructure expected to operate for decades. A community may approve bonds, transmission lines, substations, pipelines or generating facilities with similarly long lives. A developer may construct a data-center shell intended to stand for a generation.

But the processors sitting inside it may pass through several technological generations before a child entering elementary school today reaches high school.

The danger, therefore, is not simply that investors must wait thirty years for their money. The more profound danger is duration mismatch: long-lived financial and physical commitments are being undertaken to support computational equipment and business models undergoing extraordinarily rapid technological change.

That distinction makes the possibility of stranded assets considerably more interesting.

From corporate cash to the credit system

Initially, the AI boom could appear unusually safe because several principal hyperscalers were among the richest corporations in history. They possessed enormous operating cash flows and could finance much of the first buildout internally.

That situation is changing.

The Bank for International Settlements reported in January 2026 that anticipated AI investment requirements were becoming large enough to require a migration from operating cash flow toward debt, with private credit assuming an increasingly important role. The BIS concluded that macroeconomic and financial-stability risks remained moderate at that point but emphasized that sustainability ultimately depended upon AI companies meeting elevated earnings expectations.

The architecture of financing matters enormously.

The BIS subsequently documented structures in which a special-purpose vehicle acquires or constructs a data center, receives equity from sponsors and borrows from private lenders. A hyperscaler may take only a minority equity interest while entering a long-term lease or capacity-purchase agreement. The resulting obligation can behave economically rather like borrowing even though much of the formal debt sits outside the hyperscaler’s balance sheet.
The BIS calls attention to this emerging form of “shadow borrowing.”

Private-credit funds and institutional investors can own the debt. Insurers can become exposed. Banks can provide funding facilities. Guarantees and long-term commitments tie the entire structure back to the hyperscaler.

This is precisely where a technology correction could become a financial event.

S&P Global estimates that lenders committed roughly $122 billion to U.S. data-center properties in 2025 alone, using credit facilities, securitizations, commercial mortgage-backed securities and other instruments. S&P has subsequently warned that AI infrastructure debt is spreading through private credit, asset-based finance, CMBS, ABS and corporate bond markets, producing increasing problems of valuation, transparency and concentration.

The BIS Annual Economic Report 2026 goes further. It warns that a sharp repricing of equity risk could cause lenders to reassess corporate credit risk, tighten financing and potentially produce a broader corporate-credit freeze. The report specifically identifies an AI bust as one possible trigger capable of exposing vulnerabilities in private credit.

This is no longer merely an argument made by critics of Big Tech. It has entered the vocabulary of central banking and financial-stability analysis.

How an AI investment bust could propagate

Imagine, then, the sequence.

AI revenues continue growing, but not rapidly enough to justify installed capacity. Utilization rates disappoint. Competition drives inference prices downward. New processors deliver dramatically more computation per watt and per dollar, reducing the value of previous hardware generations. Corporate customers discover that smaller models running locally accomplish many routine tasks adequately. Investors begin questioning the enormous capital commitments promised for 2028, 2029 and 2030.

Equity valuations fall first.

Corporate boards respond by reducing future capex.

Semiconductor orders weaken.

Data-center developers discover that projects planned around perpetually rising demand are no longer easily financed.

Private lenders demand larger spreads. Special-purpose vehicles encounter refinancing problems. The market value of older GPUs deteriorates faster than lenders expected. Construction projects are postponed.

Utilities that anticipated huge new loads confront slower demand growth after committing capital to substations, transmission lines or generating capacity. Municipalities that offered tax incentives or infrastructure improvements discover that projected revenues and employment have fallen short.

The consequences propagate outward through construction, electrical equipment, semiconductors, engineering, commercial real estate and finance.

The IMF now explicitly identifies a related danger: expensive and increasingly debt-financed AI investments might fail to deliver expected payoffs, producing equity-market reversals, wealth losses and layoffs. It also warns that circular financing—where firms can simultaneously become investors, customers, suppliers and financiers of one another—could transmit trouble from one participant across the AI ecosystem.

This is a credible recessionary mechanism.

But credible is not inevitable.

Today’s largest hyperscalers have diversified revenue streams and formidable balance sheets. Demand for cloud services is real. AI adoption continues to expand. UBS itself reported in September that infrastructure demand remained robust and cited rapidly growing cloud and AI-chip revenues.

The likelier danger is therefore not necessarily a replay of 2008, in which the banking system itself becomes insolvent.

The historical analogy may instead be the railway and telecommunications booms: too much capital can be invested in transformative infrastructure even when the underlying technology genuinely changes civilization.

Railroads did not disappear after railway bubbles.

Fiber optics did not disappear after the dot-com crash.

The crucial question was who survived the financial restructuring and who subsequently inherited the infrastructure.

The same could become true of AI.

The distributed alternative is already appearing

This is where the European experience becomes particularly significant.

The European Union has formally adopted a Digital Decade objective of establishing at least 10,000 climate-neutral, highly secure edge nodes by 2030, geographically distributed to provide low-latency data services throughout the Union.

The European Commission describes the underlying technological transition quite explicitly. Whereas most cloud processing historically occurred in large data centers, the Commission expects a growing proportion of data to be processed nearer users and connected devices. It therefore envisions not the simple abolition of cloud computing but a computing continuum connecting cloud and edge.

The alternative to the hyperscale cloud is not necessarily ten thousand miniature replicas of hyperscale data centers.

It is a different topology.

Computation can migrate toward where information originates: factories, buildings, vehicles, ports, farms, renewable-energy systems, hospitals, universities, water systems and municipalities. Edge nodes can process time-sensitive information locally, transmitting only what needs aggregation elsewhere.

The EU’s IPCEI on Next-Generation Cloud Infrastructure and Services illustrates the direction. Seven member states authorized up to €1.2 billion in public funding intended to unlock another €1.4 billion in private investment for an interoperable, openly accessible, multi-provider cloud-edge ecosystem.

In March 2026 the Commission added EURO-3C, a €75 million initiative involving 87 consortium members to demonstrate a federated telco-edge-cloud infrastructure.
The EU is simultaneously establishing AI Factories around EuroHPC supercomputers. Nineteen AI Factories and thirteen associated antennas are being established, connecting computing resources with universities, SMEs, researchers and industry. Total EU, member-state and associated-country investment through EuroHPC in supercomputing infrastructure and AI.

Factories over 2021–27 is expected to reach approximately €10 billion.
Europe is therefore not abandoning large computation.

It is experimenting with federating computation across scales.

That may prove far more consequential than a simple contest between “big” and “small” data centers.

From hyperscale AI to bioregional AI

Take the architecture one step further and another possibility becomes visible.
A bioregion is not merely a political jurisdiction. It is a living metabolic geography organized around watersheds, foodsheds, ecosystems, transportation corridors, energy flows and human settlements.

Such regions increasingly generate extraordinary quantities of data.

A watershed produces information about rainfall, soil moisture, aquifers, stream flow, contamination and biodiversity. A renewable electricity network generates information about sunlight, wind, storage, load and grid congestion. Farms generate information about soil, crops and water. Buildings generate information about temperature and energy consumption. Mobility networks generate traffic and logistics information.

Why should every raw datum travel first to a hyperscale campus hundreds or thousands of kilometers away?

For many applications it need not.

Edge AI can interpret local conditions in real time. Federated systems can share selected models and insights without necessarily centralizing every underlying dataset. Regional computing infrastructures can interoperate with national, continental and global networks.
The result could resemble a nervous system more than a mainframe: intelligence distributed throughout the organism while higher-order functions remain interconnected.

This does not make hyperscale facilities obsolete. Training frontier foundation models, large scientific simulations, weather prediction, protein research and other computationally intensive activities may continue to require enormous centralized resources.

But inference and situated intelligence are different economic propositions from frontier-model training.

If much of AI’s eventual economic value comes from inference—millions of daily interactions with machines, factories, vehicles, buildings, farms and ecosystems—the economically decisive layer may increasingly move toward the edge.

That would change the political economy of AI.

The ownership question

Yet technological decentralization does not automatically produce economic decentralization.
A hyperscaler can own the cloud and the edge.

Indeed, a centralized corporation can deploy millions of edge devices, control their operating systems, determine their APIs, curate their data and integrate them into a proprietary cloud. Physically distributed computation can therefore coexist perfectly well with economically centralized ownership.

This is why the real question of the coming decade is not simply: cloud or edge?

It is: Who owns the edge, who governs its data, who sets its protocols, and who receives its economic rents?

If edge infrastructure is increasingly owned by SMEs, cooperatives, municipalities, public utilities, universities, hospitals, regional institutions and community enterprises operating through interoperable standards, something genuinely different begins to emerge.
Distributed computing then becomes distributed economic agency.

The European Commission’s emphasis on interoperability, multi-provider systems, open accessibility and federated cloud-edge infrastructure points toward elements of this architecture, although present EU policy by no means guarantees democratic or local ownership.

The distinction is fundamental.

The edge can become the outermost territory of the hyperscale empire.
Or it can become infrastructure for a more pluralistic digital commons.

Would a hyperscale crash accelerate the transition?

Here history becomes intriguing.

Suppose hyperscale AI investment does overshoot.

The immediate result would be painful. Workers would lose jobs. Construction projects would stop. Semiconductor suppliers would suffer. Financial institutions would write down loans. Some communities would be left with unfinished projects. Utilities could find themselves carrying infrastructure built for demand that never fully materialized.

A serious enough shock could contribute to recession.

But recessions also restructure technological systems.

Assets change hands.

Business models disappear.

Infrastructure becomes cheaper.

Skilled workers migrate into new firms.

Open-source technologies absorb innovations pioneered inside failed enterprises.
Capital searches for investments with shorter payback periods, demonstrable customers and measurable productivity improvements.

Distributed AI could become attractive under precisely those conditions because an edge installation need not necessarily gamble billions on speculative future demand. It can be attached to an existing economic activity: managing a factory, balancing a microgrid, monitoring a watershed, coordinating transportation, operating a hospital or reducing energy consumption in buildings.

Its value can therefore be judged partly by avoided cost and local productivity, not simply by selling ever larger quantities of computational tokens.

That could represent an important shift—from AI as a gigantic speculative infrastructure built in anticipation of future demand toward AI as a distributed utility embedded within existing economic and ecological processes.

But the transition would not happen automatically

There is an equally plausible opposite scenario.

A hyperscale bust could actually strengthen the surviving giants.

Bankrupt competitors could disappear. Distressed data centers could be purchased cheaply. Scarce grid interconnections could fall into stronger corporate hands. Smaller edge companies starved of financing could be acquired by hyperscalers.

The aftermath of an AI bubble could therefore produce greater concentration, not decentralization.

That is why policy matters.

Interoperability requirements, open standards, data portability, public digital infrastructure, cooperative ownership, municipal procurement, regional financing and antitrust enforcement would determine whether distributed computing becomes genuinely distributed in economic terms.

Europe’s Digital Decade is important precisely because it provides an institutional framework within which the cloud-edge transition can be shaped before the architecture becomes irrevocably concentrated.

A tale of two AI infrastructures

We may therefore be approaching not the collapse of artificial intelligence but a contest between two ways of organizing it.

The first is extraordinarily capital intensive: gigantic centralized computing complexes, huge electrical loads, proprietary frontier models, enormous financing requirements and a relatively small number of corporate gatekeepers.

The second is more distributed: computation progressively embedded at the edge, connected through interoperable networks and potentially integrated into SMEs, cooperatives, universities, public agencies, municipalities and bioregional commons.
The first architecture will not disappear. Nor should it. Civilization has legitimate uses for immense computational resources.

But the assumption that virtually every dimension of machine intelligence must ultimately pass through a handful of hyperscale corporate clouds is increasingly contestable.

The financial arithmetic may help determine the outcome.

A $4.1 trillion investment cycle creates tremendous productive capacity. It also creates tremendous expectations. If revenues, productivity gains and cash flows justify those investments, hyperscale AI may flourish alongside the edge.

If they do not, the adjustment could be severe.

And because financing is spreading outward through corporate bonds, banks, private credit, securitizations, insurers and special-purpose vehicles, the repercussions would no longer remain confined to Silicon Valley. BIS, IMF and S&P analyses all now identify versions of these transmission risks.

The deepest historical irony, however, may be that even a hyperscale AI bust would not demonstrate that artificial intelligence had failed.

It might demonstrate instead that society built too much of the wrong architecture, in the wrong places, under the wrong ownership arrangements, financed on the wrong assumptions.

The physical infrastructure would remain. The knowledge would remain. The semiconductor innovations would remain. Fiber, substations, data centers and trained engineers would remain. But their market values and ownership could change dramatically.

Out of such a restructuring, a more distributed computing system could emerge.

Europe’s 10,000-edge-node ambition, its cloud-edge continuum, IPCEI-CIS, EURO-3C, EuroHPC and the emerging network of AI Factories suggest that the technological foundations of such an alternative are no longer imaginary. They are already being constructed.

The prudent conclusion, therefore, is not that the hyperscale giants will collapse and trigger a depression. Current evidence cannot sustain that prediction. Nor can it establish that fog computing will inevitably replace hyperscale cloud computing.

The stronger conclusion is more consequential.

The world has embarked on one of the largest concentrated technology-investment experiments in modern history while the underlying technology is changing faster than much of the infrastructure financing it. Long-lived buildings, electrical systems and financial obligations are being married to computational equipment whose economic life may be measured in only a few years. Financing is simultaneously migrating outward from the hyperscalers’ enormous cash flows into debt markets, private credit, insurers, special-purpose vehicles and banks.

That combination creates a genuine systemic vulnerability.

At the same historical moment, distributed cloud-edge computing is advancing from technological concept toward physical infrastructure.

If the hyperscale investment boom substantially overshoots, the ensuing crisis could therefore become a hinge rather than an ending: the moment when artificial intelligence begins migrating away from an overwhelmingly centralized architecture toward a more distributed computational ecology.

Whether that ecology becomes merely another layer of corporate cloud power or instead becomes infrastructure stewarded by enterprises, communities, municipalities and bioregions is not predetermined by technology.

It is a question of governance.

And in that sense the most important struggle over artificial intelligence may ultimately concern neither bigger models nor more powerful GPUs. It may concern where intelligence is situated, who owns the infrastructure through which it operates, who governs the data it produces, who carries the financial risk—and whether the next digital infrastructure is organized primarily around a handful of global corporate centers or distributed across the places where economic, social and ecological life actually unfolds.

Selected references

UBS Chief Investment Office, Year Ahead 2026: Escape Velocity? UBS projects trillions of dollars of global AI capital expenditure through 2030 and identifies monetization as the crucial test.

UBS, “Monitoring AI Risks amid Volatility,” June 29, 2026; and UBS, “Constructive Fundamentals Support Further US Equity Upside,” July 31, 2026. These analyses discuss slowing-capex risks, shareholder pressure, AI spending and the rising hurdle for continued investment.

UBS Asset Management, “From Asset-Light to AI-Heavy: Infrastructure Shift,” July 2026.
Bank for International Settlements, Aldasoro, Doerr and Rees, “Financing the AI Boom: From Cash Flows to Debt,” BIS Bulletin 120, January 7, 2026.

Bank for International Settlements, “Financing the AI Infrastructure Boom: On- and Off-Balance-Sheet Borrowing,” 2026.

Bank for International Settlements, Annual Economic Report 2026, discussion of AI investment, credit markets and potential financial contagion.

International Monetary Fund, “AI: Deployment and Disruption,” Annual Report 2026, including discussion of AI investment, financial vulnerabilities and circular financing.
International Energy Agency, Energy and AI, 2025, and Key Questions on Energy and AI, 2026.

S&P Global Market Intelligence, “Banks Meeting Data Center Demand with Billions in Credit Facilities, Bonds,” February 27, 2026.

S&P Global Market Intelligence, “AI Infrastructure Debt Is Testing Private Market Valuations,” August 28, 2026.

European Commission, “Cloud Computing,” explaining the EU cloud-edge computing continuum.

European Commission, “The Edge Observatory for the Digital Decade,” documenting the target of at least 10,000 climate-neutral, highly secure edge nodes by 2030.

European Commission, “IPCEI on Next-Generation Cloud Infrastructure and Services,” documenting €1.2 billion in authorized public funding and an anticipated €1.4 billion of private investment.

European Commission, “EURO-3C,” March 3, 2026, describing the €75 million federated telco-edge-cloud initiative involving 87 consortium members.

European Commission, “AI Factories,” documenting the emerging EuroHPC network of AI Factories and antennas connecting supercomputing infrastructure with startups, SMEs, universities and industry.

Jeremy Rifkin is the bestselling author of twenty-five books translated into over thirty-five languages. He is a principal architect of the European Union’s and China’s economic plans for transitioning into a Third Industrial Revolution and he served as an economic advisor to Senate Majority Leader Charles Schumer on the U.S. infrastructure plan. He is listed among the top ten most influential economic thinkers in The Huffington Post’s global survey of “The World’s Most Influential Voices.”