The GCC’s US$93 billion AI build-out will be decided by deployment, not capital

Submer, a company that provides complete infrastructure for artificial intelligence (AI) and high-performance computing (HPC) data centres, has published its GCC AI & HPC Infrastructure Report.
The report says the Gulf Cooperation Council (GCC) region wants to become a major global centre for AI and powerful computing. The biggest problem is no longer finding investment money or getting advanced computer chips. Instead, the challenge is providing enough electricity, space and reliable systems to run large amounts of AI computing equipment. This is especially difficult in a region where temperatures rise above 40°C, water is scarce and electricity networks have limited capacity.
According to a forecast by FTI Consulting, also reported by PwC Middle East, the GCC's data centre capacity is expected to grow from about 1 gigawatt (GW) today to 3.3 GW by 2030. The region now has more than 174 tracked data centre projects, with a combined value of over US$93 billion. Access to computing power is also growing. In November 2025, the United States approved exports of up to 35,000 NVIDIA Blackwell chips each to Saudi Arabia's HUMAIN and the UAE's G42. HUMAIN also plans to install up to 600,000 NVIDIA graphics processing units (GPUs) over the next three years.
“The GCC has big goals, plenty of money and growing access to computer chips. What it needs now is the ability to turn these resources into AI systems that work reliably,” said Sami Alfaraj, Field CTO at Submer MEA, who wrote the report. “The infrastructure choices made during this period will decide whether the region's AI systems can grow while keeping costs reasonable, working reliably and using resources responsibly.”
The report explains that electricity supply and heat management are closely connected. Getting enough electricity from the power grid now takes longer than building a data centre itself. Even when money is available, projects must wait for electrical substations, upgrades to power lines and the testing needed before systems can start operating. At the same time, the amount of electricity used by each AI equipment rack is increasing from around 30 kilowatts (kW) toward 150 kW. One NVIDIA GB300 NVL72 rack normally uses about 132 to 135 kW and can reach around 155 kW at its highest demand. It is designed to be cooled using liquid. Because better cooling systems reduce the extra electricity needed to run a data centre, the report says efficient cooling can help operators get more computing power from the same amount of electricity.
Water is another major challenge. Reports suggest that data centres in Saudi Arabia used around 15 billion litres of water in 2024. This is especially important because the region relies on desalination, a process that uses a lot of energy to turn seawater into fresh water. The report says there is currently no single legally binding rule across the GCC requiring data centres to meet water or energy efficiency standards. Instead, businesses face pressure to reduce costs. Closed-loop cooling systems, which reuse cooling liquid rather than continually using new water, can operate with zero direct water consumption even when equipment produces extreme amounts of heat. This can give operators lower running costs and more choices about where to build data centres.
The report also identifies five other important findings.
- Data centres will increasingly use a mix of cooling methods. Direct-to-chip cooling, which sends cooling liquid straight to computer chips, made up 42.85% of liquid-cooling revenue in 2025. Immersion cooling, which places equipment in special cooling liquid, can support more than 100 kW per rack. It can also achieve a power usage effectiveness (PUE) score of 1.02 to 1.03, meaning very little extra electricity is used beyond what the computing equipment needs. The report expects operators to use direct-to-chip cooling, immersion cooling and rear-door heat exchangers together in the same data centre.
- Having control over AI systems means more than keeping data inside a country. Storing data within national borders is now a basic requirement for following local rules. The report says real AI sovereignty means being able to build, run and maintain important AI infrastructure locally without depending on others to operate it.
- Customers want one partner to take responsibility. AI infrastructure has become too complicated to buy and manage as separate pieces. Government-backed organisations and businesses increasingly prefer one partner that takes responsibility for cooling, mechanical equipment and information technology (IT) systems, from the first design stage through daily operations.
- Data centres must work with chips from different suppliers. AMD reported US$5.8 billion in data centre revenue in the first quarter of 2026, an increase of 57% compared with the same period a year earlier. Large cloud computing companies, known as hyperscalers, are also quickly developing their own custom chips. Because of this, data centres need to support NVIDIA chips, AMD chips and specially designed chips, even though they have different electricity and cooling needs.
- The market is expected to develop in three stages. In 2026–2027, the first large AI computing systems will begin operating. In 2027–2028, the focus will move toward growing these systems while making them more sustainable. By 2028–2030, the GCC is expected to become a more developed centre that can operate its own AI systems and provide computing power to customers across the Middle East and Africa.
“Government-backed organisations and businesses are buying AI infrastructure faster than they can develop their own teams with the skills to plan, connect and run it,” Alfaraj continued. “When one partner is responsible for cooling, mechanical equipment and IT as one complete system, there is less risk of problems during delivery. It also becomes faster and easier to predict how long it will take to move from a design plan to working computing capacity. Having a capable partner who takes responsibility is now harder to find than money or computer chips.”
Submer works with GCC governments, government-owned investment funds, data centre operators and businesses. Its services include advice, design and engineering, connecting IT equipment, electricity and cooling systems, and modular data centre solutions. The company has its regional headquarters in Saudi Arabia, a team in the UAE and dedicated leadership for the Middle East and Africa. Its cooling systems can support more than 100 kW per rack and can run in a closed loop with zero direct water consumption. These systems are designed to work well in hot, dry environments.
The GCC AI & HPC Infrastructure Report looks at Saudi Arabia, the United Arab Emirates, Qatar, Kuwait, Bahrain and Oman. It uses 2026 as its starting year and looks ahead to 2030. The report brings together publicly available market information, announcements from governments and data centre operators, and forecasts from analysts. Some market-size numbers are described as modelled estimates. These are Submer's calculations based on stated assumptions, so they should be treated as approximate ranges to help people make decisions, rather than exact figures.
Read the full GCC AI & HPC Infrastructure Report at https://www.linkedin.com/posts/submer-mea_gcc-ai-hpc-infrastructure-report-activity-7523382526158016512-81qF.
Image credit: Submer